50,000 Litres of GMP Supply, Delivered in Under Five Weeks
When a vaccine manufacturer needed large-volume GMP supply on a timeline measured in weeks, PAN-Biotech quoted in three days and delivered ~50,000 litres in under five weeks — at GMP quality.
The challenge
In October, a vaccine manufacturer approached PAN-Biotech with an urgent, large-volume production need. The timeline was measured in weeks, not months — every week of delay put their own programme at risk. They needed a GMP partner who could quote, qualify and produce at speed.
The turnaround
PAN-Biotech returned a convincing quote within three days. The first order followed on 16 November; first production began on 8 December — three weeks later — and the first delivery went out on 20 December, in under two weeks. By 10 January, ~50,000 litres had been delivered — in under five weeks from first production, at GMP quality.
Why it works
- Speed is the product — when a manufacturer's timeline is measured in weeks, a 3-day quote and a 5-week delivery are the difference between staying on schedule and slipping.
- GMP without the wait — ~50,000 L at GMP quality, produced inside three weeks of the order and delivered inside two weeks of production start.
- Scale on demand — large-volume GMP supply, drawn from validated processes and EU Annex 1 manufacturing.